Stargate Norway is planned to deliver 230MW of capacity, with ambitions to expand by an additional 290MW – positioning it among the most significant AI infrastructure investments in Europe. The project marks OpenAI’s first data centre initiative on the continent and the inaugural European site under its “OpenAI for Countries” programme.

Area of Land

60 Ha secured. Site preparation completed and 16 Ha levelled area. Top gravel layer on select plots.

Area of Land

60 Ha secured. Site preparation completed and 16 Ha levelled area. Top gravel layer on select plots.

Area of Land

60 Ha secured. Site preparation completed and 16 Ha levelled area. Top gravel layer on select plots.

Electric Power

230 MW installed on site. 1 km from central grid.

Electric Power

230 MW installed on site. 1 km from central grid.

Electric Power

230 MW installed on site. 1 km from central grid.

Zoning Plan

25 Ha zoned for data centre/power intensive industries.

Zoning Plan

25 Ha zoned for data centre/power intensive industries.

Zoning Plan

25 Ha zoned for data centre/power intensive industries.

Fibre

Redundant fiber routes out of the site.

Fibre

Redundant fiber routes out of the site.

Fibre

Redundant fiber routes out of the site.

Water

Access to local water grid 8 l/s.

Water

Access to local water grid 8 l/s.

Water

Access to local water grid 8 l/s.